Valley Fields, Surrey

A substantial residential redevelopment bringing extension, reconfiguration and a renewed external envelope into one coordinated construction programme.

Architectural visualisation
Project introduction

Substantial redevelopment, coordinated as one build.

The verified public scope combines partial demolition of the existing dwelling with a rear extension, side extensions, external re-cladding, internal alterations, a first-floor terrace and a rear patio.

Project
Valley Fields, Surrey
Type
Residential redevelopment
Role
Principal Contractor
Technical design responsibility

Construction design developed around key structural and envelope elements.

Kaislar’s contractor-design scope includes detailed construction design for the structural frame, foundations, wall build-ups, floor build-ups and roof build-ups.

Relevant design information is developed and reviewed before those elements are progressed on site. This connects technical intent, buildability and sequence earlier in the programme and supports more controlled decisions during delivery.

Coordinated construction responsibility

Kaislar as Principal Contractor.

Kaislar is appointed as Principal Contractor for the project, coordinating the construction phase and the interfaces between issued design information, contractor-designed elements, specialist input and work on site.

The role is presented here at a practical customer level. Private contractual, client and consultant information remains outside the public project record.

Project scope
01

Existing structure

Partial demolition and internal alterations create the basis for the renewed residential layout.

02

Extended home

Rear and side extensions increase and reshape the usable residential space.

03

External environment

External re-cladding, a first-floor terrace and rear patio form part of the coordinated redevelopment.

Delivery sequence

From pre-construction design into coordinated delivery.

The project is organised through planning, pre-construction, demolition, groundworks, structure, envelope, first fix, fit-out and completion. Progress information is published only when it is verified and suitable for the public project record.

  1. 01Planning
  2. 02Pre-Construction
  3. 03Demolition
  4. 04Groundworks
  5. 05Structure
  6. 06Envelope
  7. 07First Fix
  8. 08Fit-Out
  9. 09Complete
Earlier technical coordination

Decisions aligned before work advances on site.

Bringing contractor-design information into the pre-construction and delivery process helps resolve key interfaces between the structural frame, foundations and envelope build-ups at the point they can still be coordinated.

Architectural media

The intended residential composition.

The architect-provided visualisation remains clearly labelled and is used as the video poster and fallback image.

Architectural visualisation poster of Valley Fields, SurreyArchitectural visualisation
New Malden residential construction in progress
Related development

New Malden New Build

Explore current construction evidence for an approximately 300 m² residential new-build scheme.

View developments