Construction Underway

Hersham, Surrey

A new residential development delivering two semi-detached homes through a coordinated demolition, design and construction programme.

New Build · Two Semi-Detached Homes

Current stage · Demolition & Site Preparation

Architectural section drawing for upcoming Kaislar new-build project in Hersham, Surrey
Architectural design reference · Proposed section
Project overview

A new residential development taking shape in Hersham.

This Kaislar project will replace the existing structure with a pair of new semi-detached homes, combining carefully coordinated demolition, structural works, modern construction methods and full residential delivery.

The scheme includes two principal storeys with additional crown-roof accommodation, together with below-ground kitchen areas and new rear amenity spaces.

Location
Hersham, Surrey
Type
Two semi-detached new-build homes
Status
Construction Underway
Latest update · Construction Underway

Construction Begins in Hersham.

Demolition works commence as Ytong AAC materials arrive on site.

Our latest footage captures the first stages of construction at Hersham, from demolition of the existing property to the arrival of Ytong AAC blocks for the planned masonry works.

Follow the project as the new homes take shape, with construction progress documented at each verified stage.

Read Development Journal Update 001
Project scope

Scope of delivery

01

Demolition & site preparation

Removal of the existing building and rear garaging before the new development begins.

02

Design & technical coordination

Architectural development, structural engineering and technical coordination ahead of construction.

03

Groundworks & substructure

Foundations, below-ground works, drainage coordination and substructure.

04

Structural construction

Structural steel framing and YTONG masonry form the proposed construction strategy.

05

Roof & envelope

Crown-roof construction, external wall insulation and a rendered external finish.

06

Internal works

MEP installation and internal finishing stages.

07

External works

Rear amenity areas, external works and landscaping coordination.

Construction strategy

Modern construction coordinated from the outset.

The current construction strategy combines structural steelwork with YTONG masonry, external wall insulation and a rendered finish.

The project also requires careful coordination of ground levels, drainage, structural interfaces and the roof accommodation.

Site & delivery

Planned around the site from day one.

The site requires careful sequencing around tree protection, access, deliveries, drainage and neighbouring properties.

These constraints inform the programme, logistics and structural methodology as demolition and site preparation progress.

Development journal

From pre-construction into site delivery.

Follow verified construction progress at Hersham, beginning with demolition and material delivery. Dates identify publication of each update.

Published
Update 001
Demolition & Materials Delivery
In Progress

Demolition Begins. Ytong Arrives.

Construction is now underway on our Hersham new-build project in Surrey.

The first stage involves demolition of the existing house, making way for the proposed residential development.

Alongside the demolition works, deliveries of Ytong autoclaved aerated concrete (AAC) blocks have started arriving on site, preparing materials for the upcoming wall construction stages.

This early activity marks the transition into active construction, with site preparation and material coordination helping establish the next steps of the build.

As the project progresses, we will document the key construction stages, technical decisions and visible milestones through this Development Journal.

Project preparation context
Pre-construction

Pre-construction coordination

Architectural, structural and technical information is being developed and coordinated ahead of construction.

Pre-construction

Construction methodology

The proposed build strategy is being developed around structural steelwork, YTONG masonry and the project’s below-ground and roof-level requirements.

Upcoming

Coming next

Groundworks and subsequent construction stages will be documented here as verified activity advances.

Technical notes

Preparing for the next construction stages.

01

Demolition & Site Preparation

Initial demolition works are progressing to prepare the existing property for the approved development scope. These works establish the site conditions for subsequent construction activities.

02

YTONG AAC Material Delivery

Ytong AAC blocks have been delivered for the proposed wall construction. This represents material preparation for upcoming works, rather than completed masonry.

Project stages

The current position in the delivery sequence.

Demolition is the current active stage. Later stages show the planned sequence. Earlier stages are not marked as formally complete; this tracker does not represent approval or sign-off.

  1. 01Planning
  2. 02Pre-Construction
  3. 03Demolition
  4. 04Groundworks
  5. 05Structure
  6. 06Envelope
  7. 07First Fix
  8. 08Fit-Out
  9. 09Complete
Related developments
New Malden residential construction in progress

New Malden New Build

Follow current construction evidence and the development journal for Kaislar’s New Malden scheme.

View development journal
Architectural visualisation of Caterham, SurreyArchitectural visualisation

Caterham, Surrey

Explore a residential redevelopment combining coordinated design and construction delivery.

View development journal
Project enquiry

Planning a similar residential project?

Share your site, planning position and available project information with the Kaislar team.

Explore Residential Development Delivery